Energy efficiency
Project type Project description
Acids and fertilizers production

Neochim PLC is located in Dimitrovgrad in Haskovo district. The company used financing from the BEERECL for the implementation of an automated steam production management system. Energy Efficiency Reduces Energy Costs by 14.5 %

read more ...

Agriculture

The project helped Kolendro to reduce significantly the high fuel consumption and the O&M costs. Energy Efficiency Reduces Energy Costs by 32 %

read more ...

Agriculture

The energy efficiency measures financed by BEERECL included converting two boilers to natural gas, installation of a co-generator, and reconstruction and modernization of the boiler rooms. The Reduced Energy Costs by % : 96,3%

read more ...

Agriculture

Подмяната на селскостопански трактори, комбайни, пръскачки и други приспособления с модерно оборудване са често срещани проекти, финансирани по КЛЕЕВЕИ. Разходите за енергия спадат с 45 %

още ...

Beverages

By implementing the project and replacing the old inefficient equipment with modern energy efficient technologies, the brewery not only reduced its annual energy costs and carbon emissions, but also improved workplace safety. Energy Efficiency Reduces Energy Costs by 23 %

read more ...

Food

In 2011, the company purchased a building and then renovated the building and its energy systems with the support of BEERECL. Energy Efficiency Reduces Energy Costs by 67 %

read more ...

Food

The company improved its production process by introducing a new production line utilising modern technology with financing from BEERECL. Energy Efficiency Reduces Energy Costs by 64%

read more ...

Hotel

The installation of roof and wall insulation combined with installation of new and modern heating and cooling equipment not only reduced the energy consumption in the building but also provided better indoor conditions for all the staff and guests.Energy Efficiency Reduces Energy Costs by 76.26 %

read more ...

Hotel

The company built Hotel Shipkovo in the Stara Planina mountains and used BEERECL financing for a geothermal heat pump system installation. Heat production of 387 MWh per year

read more ...

Industrial production

The project involved the installation of a biomass steam boiler on straw on the site of the biofuel plant. Energy Efficiency Reduces Energy Costs by 64%

read more ...

Manufacturing

The project involved insulation of the outside walls and roof, and replacement of the old, poorly installed window and door frames with new efficient ones. Energy Efficiency Reduces Energy Costs by 37.5 %

read more ...

Manufacturing

By introducing a new process line and replacing the machines with new automated machines, the production process was significantly improved. Energy Efficiency Reduces Energy Costs by 55 %

read more ...

Manufacturing

The BEERECL loan was used to upgrade the production equipment. Energy Efficiency Reduces Energy Costs by 73%

read more ...

Manufacturing

The firm invested in a complex set of energy efficiency measures using BEERECL funds. Energy Efficiency Reduces Energy Costs by 44 %

read more ...

Manufacturing

Delta Textile received a BEERECL loan to replace 49 knitting and 12 sewing machines with 34 state-of-the-art knitting machines. CO2 , SO2 , NOx and dust emissions reduction

read more ...

Manufacturing

Biovet JSC is a leading Bulgarian manufacturer and marketer of medicated and nutritional food additives, enzymes, and pharmaceuticals, located in Peshtera. Energy Efficiency Reduces Energy Costs by 12,6 %

read more ...

Mining and Processing

The project financed under the BEERECL upgraded the heating ventilation and air conditioning (HVAC) systems at five administrative buildings, and replaced four old forklifts. Energy Efficiency Reduces Energy Costs by 78 %

read more ...

Pharmaceutical industry

The project helped Kolendro to reduce significantly the high fuel consumption and the O&M costs. Energy Efficiency Reduces Energy Costs by 32 %

read more ...

Service

Mototehnika Sliven JSC has an automobile service center in Sliven. The BEERECL loan helped the company to install exterior wall thermal insulations, double glazed windows, and energy efficient metal doors in the center’s building. Energy Efficiency Reduces Energy Costs by 47 %

read more ...

Renewable energy
Project type Project description
Biomass

The electricity produced covers the company’s own needs, while any surplus is sold to the National Electric Company. The project uses 12,9000 tons of wood waste per year.Electricity production of 8,625 MWh per year

read more ...

Wind

Ventus Ltd. is located in Hrabrovo village in Dobrich region of Bulgaria. With BEERECL financing, the company installed a wind turbine of 2.0 MW capacity. Electricity production of 6,014 MWh per year

read more ...

Wind

Parkeco BG Ltd is located in the Burgas region in Bulgaria. The project financed by BEERECL includes installation of one new wind turbine generator with installed electricity capacity of 1.5 MW. Electricity production of 4,466 MWh per year

read more ...

Renewable Energy - Hydro
Project type Project description
Hydro Power Plant

The hydropower plant was designed and is operated to ensure the down stream water needs of two irrigation systems, two towns and many fields. The project generates 5,580 MWh of green power per year. Energy Efficiency Reduces Energy Costs by 44 %

read more ...

Renewable Energy - Solar
Project type Project description
Solar water heating

The company used BEERECL financing to install a solar water heating system at their Albena resort’s Kaliakra Hotel. The investment reduced the water heating energy costs by 92.9%

read more ...