Case study - Energy efficiency - Delta Textile Ltd.

Delectra Hydro JSC built a small irrigation system hydro power plant on the Belmeken-Sestrimo cascade in the Pazardzhik region. The hydropower plant was designed and is operated to ensure the down stream water needs of two irrigation systems, two towns and many fields. The project generates 5,580 MWh of green power per year.

Investment Details:

  • Total Project Cost : 346,716 EUR
  • KIDSF Grant : 56,000 EUR
  • Loan : 280,000 EUR
  • Simple Payback Period : 1.8 years
  • Internal Rate of Return : over 61%

Estimated Annual Figures

  • Annual Electricity Production : 5,580 MWh
  • Total Revenues : 194,210 EUR

Project results

  • CO2 , SO2 , NOx and dust emissions reduction
Files Size
DeltaTextile_EE_Eng.pdf DeltaTextile_EE_Eng.pdf 645 kB
Delta_EE_Bg.pdf Delta_EE_Bg.pdf 589 kB